Fabrication and erection of 550 tonnes of structural steelwork, including the installation of precast concrete flooring, lift shaft, culverts and a 15 tonne stair pod.
- Location
- Project Type
- Sector
- Steel Tonnage
- Works Carried Out
- Leicestershire
- Emergency Department
- Main Contractor
- 550t
- Structural Steelwork, Metal Decking, Pre-cast concrete flooring, Stairs, Lift shaft, Culverts
The project required that the structural steelwork and associated sub-trades were completed within a 12 week programme whilst ensuring that the ‘A&E’ department was able to function as normal.
The external façade consists of concrete curtain walling which was supported by bespoke steel bracketry also designed, manufactured and installed by Robinson.
Robinson assisted with the early stage buildability studies to ensure the project was erected safely on programme.
“The collaboration between Interserve and Robinson in the design and early planning stages was crucial to the successful delivery of this complex project”
Roger Bancroft - Interserve plc